Reels

Watch walls change. Real wall wrap installs from Ardor's crew.

Panels rolling out, seams lining up, shop footage from the cutter and finished rooms. Filter by space or watch the install clips back to back.

Juicy Power Yoga Studio Wall Wrap

Gyms & SchoolsApr 26, 2026

Juicy Power Yoga Studio Wall Wrap

A custom wall wrap for Juicy Power Yoga in Mountlake Terrace that brings energy and identity into the studio.

Window Perf and Building Sign, Enumclaw

Windows & StorefrontsApr 9, 2026

Window Perf and Building Sign, Enumclaw

Perforated window film and a Dibond building sign give this Enumclaw storefront a bold street presence.

Cutting UMC's Wall Wrap Panels

Behind the ScenesLength 0:24Aug 9, 2026

Cutting UMC's Wall Wrap Panels

Every panel of UMC's wall wrap is cut and prepped on our Zund cutter before it touches the wall.

UMC Wall Graphics, New Everett Office

Offices & LobbiesLength 0:09

UMC Wall Graphics, New Everett Office

Custom wall graphics for University Mechanical Contractors' new Everett office, printed on 3M film and installed by our crew.

Interior Wall Wrap, Snohomish

Restaurants & RetailLength 0:24

Interior Wall Wrap, Snohomish

A custom printed interior wall wrap for a Snohomish business, printed on our HP 800W and cut on our Zund G3.

Custom Wall Wrap Install, Bellevue

Offices & LobbiesLength 0:28

Custom Wall Wrap Install, Bellevue

Installing a custom wall wrap in Bellevue to brand a business space and give the office a strong first impression.

13 reels · Scan complete

Got a wall like one of these?

Send us a photo. We'll measure it on-site for free and show you a proof on a picture of your own wall.

What you're watching

How a custom wall wrap goes up, panel by panel

Every clip on this page comes from an Ardor job. Some follow an install from blank wall to finished room, like the panel-by-panel install in Everett. Some are shop footage: a Snohomish wall wrap printed on our HP 800W, or UMC's panels cut and prepped on our Zund cutter before they touch the wall. Others are quick reveals of a finished space, like the Juicy Power Yoga studio in Mountlake Terrace or a winery tasting room in Woodinville.

Wall film prints on 54-inch rolls, so any wall wider than one roll goes up as a set of vertical panels. Each panel is printed, laminated when the job calls for it and cut to size in our shop. On the wall, each panel overlaps the last at the seam and the art lines up across the join.

Most of the work you don't see happens before the first panel. The wall has to be clean, dry and sound. Avery says fresh paint should dry at least seven days before film goes on, and 3M recommends wiping walls with a mix of 70% isopropyl alcohol and 30% water. Block, brick and heavy texture take a conformable film worked in with heat. Our wall surfaces guide covers prep for each surface.

On a typical install day, the first panel is hung level from the top and squeegeed down. The next panel overlaps it, and so on across the wall, then the edges get trimmed and pressed down in a final pass. A single wall usually takes our crew one day. For the full path from wall wrap design to finished wall, read how wall wraps are made.

What to watch for in an install

Use this list when you watch a clip, or when a crew is on your own wall. Each step names the guidance behind it.

  1. Step 1

    A clean, cured wall

    Before any film goes up, the wall gets wiped down and checked. Fresh paint is a warning sign until it has cured.

    Avery: let the final coat dry at least 7 days. 3M: clean with 70% isopropyl alcohol and 30% water.

  2. Step 2

    Film at room temperature

    Panels rest flat in the room before they go up, so the film and adhesive match the space.

    Avery IB 6.50: rest at least 1 hour. Avery MPI 2600 minimum application temperature: 40°F.

  3. Step 3

    A level first panel

    The first panel sets the line for every panel after it, so it goes up plumb from the top.

    Mactac: hang the first strip plumb with a spirit level.

  4. Step 4

    Hinge, peel, squeegee

    Big panels are taped at the top. The liner comes off a section at a time while the squeegee follows. A stray bubble gets a pin prick and another squeegee pass.

    Avery IB 1.6: expose 200 to 400 mm of adhesive at a time on large panels.

  5. Step 5

    Heat on texture

    On block, brick or textured paint, look for a heat gun and a rivet brush working the film into the surface.

    Avery IB 1.6 and 3M's textured-wall method both use heat.

  6. Step 6

    Trimmed edges and a final pass

    Corners, door frames and trim get a clean cut, then every edge is pressed down again.

    Avery IB 6.50: trim 1/4 in at corners and 1/8 to 1/4 in at doors and openings.

Watch like an installer

Three things to notice in every clip

What separates a clean wall wrap from a bubbly one happens fast on video. Here's what to look for.

  • Seams

    01

    Panel seams

    Wall film prints on rolls, so walls go up in vertical panels. Watch how each panel overlaps the last. Avery calls for at least a half-inch overlap on multi-panel graphics.

  • Technique

    02

    Squeegee strokes

    Installers pull the squeegee across the film in firm, overlapping strokes. Avery warns that pushing it stretches the film.

  • Finishing

    03

    Edges and outlets

    Corners and door edges get trimmed and brushed down. Outlet and switch covers come off and go back on over the film (industry rule of thumb).

FAQ

Frequently asked questions

Are these real Ardor projects?

Yes. Every clip on this page comes from Ardor Printing's own Instagram, TikTok and YouTube accounts or our shop footage.

Why do wall wraps go up in panels?

Wall film comes on rolls, and Ardor prints wall film on 54-inch rolls. A wide wall is printed as vertical panels that overlap slightly at each seam, then installed one panel at a time.

How long does an install like this take?

A single wall usually installs in one day. Multi-wall, floor or building projects take several days.

Can you install while we're open?

Yes. We can schedule after-hours installs so your office, church or shop stays open during the day.

Can I see finished photos of projects like mine?

Yes. Our projects page groups finished walls by space type: offices, churches, restaurants and retail, gyms and schools, exhibits and storefronts.

Will the wall look the same when the wrap comes off?

Not always. Removable films peel cleaner, but paint can lift on weak or aged paint. We check your wall first and tell you the removal risk before you decide.

What happens before the first panel goes up?

The wall gets checked and cleaned. At the on-site measure we look for fresh paint, flaking and texture, because film holds only as well as the paint under it. Avery says new paint should dry at least seven days, and some paints take months to fully cure.

Will I see the seams?

Wide walls need seams, because wall film prints on 54-inch rolls. Panels overlap at each seam, and we plan the layout so seams fall in low-visibility spots.

What's happening in the shop clips?

That's the work before install day. We print wall graphics in our Snohomish shop, including on our HP 800W, and cut and prep every panel on our Zund cutter before it leaves. Then our crew brings the panels to your site.

Free on-site estimates · Ardor Printing

Getafreeon-site estimate

Send a few photos of your wall or book a visit. We measure, check the surface and send a quote. Call (425) 629-0796 or request your estimate online.

Handled by Ardor Printing → ardorprinting.com12531 Old Snohomish Monroe Rd., Snohomish, WA 98290